Skip to main content
Breadcrumb
Edit
The peak load current in the rating table is based on 100-ms application (1 shot). Can a higher current be applied if the time is shorter?
The peak load current in the rating table is based on 100-ms application (1 shot). Can a higher current be applied if the time is shorter?
Product Category
PhotoMOS®
Answer
Short Question ID
higher-current-shorter-time
FAQ Weight
0